wheel torque RENAULT TWINGO 2009 2.G Electrical Equipment - Petrol Injection Workshop Manual

Page 199 of 348

17B-199V7 MR-413-X44-17B000$151.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET061CYLINDER
1 RECOGNITION
–Completed
–Not completed
STATUS
DEFINITIONCOMPLETED: This status indicates that the cylinder 1 injector command recognition
is active.
NOT COMPLETED: This status indicates that the cylinder 1 injector command
recognition is inactive.
NOTESThere must be no present or stored faults.
Special notes:
Only perform these tests if the parameters do not correspond with the system operation
programming.
Conformity check: Engine stopped and ignition on, or engine running at idle speed, and engine coolant
temperature > 80˚C.
COMPLETED
or
NOT
PERFORMEDThe status is completed when the engine is started if the engine phasing is correct.
Run command RZ005 Programming and program the engine flywheel target
(see Configurations and Programming). Check the programming using ET089
Flywheel target programming.
Engine phasing:
On engines without a camshaft sensor, the engine phasing is performed by software. A "Memo-phasing" program
is run first to phase the engine management on starting according to the data saved from the previous setting. Wait
30 seconds (for the data to be saved) before disconnecting the computer.
Then, a second program confirms the first decision. It is based on torque analysis. The torque calculation is based
on the analysis of the time taken for the engine flywheel teeth to pass by. The engine speed should be between
320 rpm and 5,000 rpm.
Run command RZ005 Programming and program the engine flywheel target (see Configurations and
Programming). Check the programming using ET089 Flywheel target programming.
SIM32_V44_ET061/SIM32_V4C_ET061/SIM32_V50_ET061/SIM32_V54_ET061
AFTER REPAIRCarry out a road test, then check with the diagnostic tool.